Project Description

Gas cooling systems

GO-PKK 1/2

Cooling- Condensate drainage

Gas cooling systems

GO-PKK 1/2

Cooling- Condensate drainage

THE GO-PKK 1/2

Device for cooling the gas to separate the water vapor contained.

Messgaskühlsystem GO-PKK 1/2 Gasanalytik

THE GO-PKK AT A GLANCE

  • Compact design in a transportable case

  • With cyclone heat exchanger (pat. DPB 38 33 192)

  • Fast operational readiness of approx. five minutes

  • Helps to accurate readings

  • Leaching losses are prevented

  • Stable exit dew point

Messgaskühlsystem GO-PKK 1/2 Gasanalytik

TECHNICALLY MATURE AND EXPANDABLE

Get accurate results with the GO-PKK 1 and GO-PKK 2.

Avoid effective leaching losses.

Standard equipment

  • Funktionsüberwachtes Peltier-Elemen
  • Integrated alarm technology

  • Peltier gas cooler

  • Condensate pump

  • Condensate collection vessel

Options / accessory

  • Aerosolfilter
  • Brackets for heated pipe

  • Power plug for heated gas sampling probe and heated analysis line
  • Temperature controller for heated analysis line

THE PERFORMANCE PROFIL GO-PKK

Power supply 230 V / 50 Hz230 V / 50 Hz

GO-PKK 1

GO-PKK 2

Height 310 mm 310 mm
Breadth 450 mm 450 mm
Depth 230 mm 230 mm
Weight approx. 9 kg approx. 9 kg
Power consumption max. 200 VA max. 200 VA
Cooling rate approx. 110 kJ/h approx. 110 kJ/h
Operating pressure max. 4 bar max. 4 bar
Volume of heat exchangers 25 ml 50 ml
Inlet dew point max. 55°C max. 60°C
Flow rate 50 – 150 l/h 50 – 250 l/h
Outlet dew Point +5°C +5°C
Ambient temperature +5°C to +30°C +5°C to +30°C
DOWNLOAD DATA SHEET
BACK TO THE OVERVIEW GAS ANALYTICS

THANK YOU FOR YOUR INTEREST IN THE GO-PKK 1/2

Do you have anymore questions? Do you want to get to know the GO-PKK?

Download the product data sheet or contact us personally. We are glad to be here for you! We will be glad to help you.

PLEASE CONTACT US